Approvals
ADM/DMT, ADCD, ADDC/TAQA, Estidama and landlord NOCs — the named pathways for office fit-out in Abu Dhabi.
Office fit-out in Abu Dhabi runs through named authority and landlord pathways — not generic “municipality” language. This guide covers ADM/DMT, Abu Dhabi Civil Defence (ADCD), ADDC/TAQA, Estidama where required, and building NOCs. No invented AED bands.
Abu Dhabi authority stack
KOJ confirms the exact stack for your plot and use at the brief stage — then prepares submissions alongside design.
ADM / DMT
Municipality and department pathways for building and fit-out submissions where those routes apply to your plot and use.
ADCD
Abu Dhabi Civil Defence fire and life-safety approvals, coordinated with drawings and site works.
ADDC / TAQA
Power and utility pathways when connections or loads change.
Estidama
When Estidama applies, materials and documentation are planned with the design — not bolted on at the end.
Landlord / OAM NOC
Building-management approval before disruptive works, prepared alongside authority packs.
Plot & use confirmation
Authority map locked before drawings freeze — so Commercial & Hospitality programmes stay predictable.
How approvals sit inside Design & Build
Approvals are a design input — not a late-stage surprise. Four steps keep the capital route clear.
01 — Brief & site review
Confirm plot, use, landlord manual and opening date.
02 — Authority map
Lock ADM/DMT, ADCD, ADDC/TAQA and Estidama requirements before drawings freeze.
03 — Submission pack
Drawings, schedules and supporting documents prepared for each pathway.
04 — Coordinate & deliver
Comments resolved with design and site teams through to handover.
What drives office fit out cost in Abu Dhabi
Same honesty as Dubai: no invented AED bands. Cost follows scope, MEP and the authority route your floor actually needs.
Floor area & density
Space quantum and how tightly workplaces and support rooms are planned.
Starting condition
Cat A, shell and core, or live refurbishment inside an operational tower.
Finish & joinery
Commercial & Hospitality specification — from standard workplaces to premium lounges.
MEP & fire strategy
Changes beyond base-build that trigger ADCD and utility pathways.
Estidama documentation
When required, material and green-building packs planned with design.
Programme & phasing
Live-building constraints, night works and staged handover windows.
Estidama and regulated environments
When Estidama applies, material selections and documentation are planned with the design. Published KOJ Abu Dhabi work includes a financial headquarters fit-out, an auditorium interior and airport lounge hospitality — each delivered inside regulated environments.
Cat A and Cat B in Abu Dhabi
Cat A
The landlord base-build ready for an occupier — ceilings, raised floors, core MEP and fire systems.
Cat B
Your interior fit-out. Crossing from shell and core, changing MEP, or working inside operational towers usually moves cost and programme.
Landlord NOCs and building manuals
Most Abu Dhabi office fit-outs need building management approval before disruptive works. KOJ confirms landlord or OAM requirements at the brief stage and prepares the package alongside ADM/DMT and ADCD submissions.
Live buildings and phased delivery
Operational floors
Banking floors, lounges and workplaces often stay open. We sequence zones and protect occupied areas.
Agreed windows
Working hours and access routes are locked early so Commercial & Hospitality operations continue while fit-out progresses.
Areas we serve in Abu Dhabi
Supported by our Abu Dhabi office and Dubai head office on the 17th Floor of Festival Tower.
ADGM / Al Maryah
Al Reem Island
Corniche / Al Khalidiyah
Yas Island
Masdar City
Mussafah
Airport Road
Who this approvals guide is for
Corporate HQ
Banking & finance
Executive offices
Hospitality & lounges
Regional offices
Proof already on record
KOJ Interiors — 5,000+ projects across the GCC since 2018, ISO 9001:2015, ISO 14001:2015, ISO 45001:2018. Festival Tower HQ, Abu Dhabi office, info@kojinteriors.com, +971 4 4087 111.
Related Abu Dhabi delivery
Corporate Banking, Abu Dhabi
Financial headquarters interior with approvals discipline.
The Auditorium
Approximately 3,000 sqm corporate interior in Abu Dhabi.
The Airport Lounge
Hospitality refurbishment inside a live, regulated environment.
Next step
Abu Dhabi city page
Review Fit Out Company in Abu Dhabi for sector proof, districts and FAQs, then share your brief for an itemised proposal with the correct ADM/ADCD route.
Dubai cost & process guide
For Dubai process drivers, DM/DCD/DEWA/Trakhees/DDA/DMCC and landlord NOCs without invented AED bands, see Office Fit Out Cost Dubai 2026.
Approvals FAQs
Need support with fit-out approvals in Abu Dhabi? Our Abu Dhabi and Dubai teams are ready to help.
Are you an office fit out contractor or a design company?
Both. Choose Design & Build for one team from concept to handover, or Build Only when your designer's drawings are already approved.
What drives the cost of an office fit out in Dubai?
The main factors are floor area, the starting condition of the space (Cat A or shell and core), the level of finishes and joinery, MEP changes, furniture and AV scope, authority and building approvals, and the programme. Phased working inside an occupied office also shapes the plan. We prepare a clear, itemised proposal after a site visit and brief, so every line of scope is visible from the start.
How much does an office fit-out cost in Dubai?
Floor area, finishes, joinery, MEP, approvals and programme each play a part. KOJ Interiors reviews the space and brief first, then sets clear scope and pricing — so decisions land early, with full visibility. Read our fit out Dubai cost guide.
How long does an office fit-out take in Dubai?
Office fit-out timelines in Dubai are set by floor area, design complexity, approvals and site conditions. KOJ Interiors confirms the programme once the scope is clear, aligns sequencing before work begins and manages delivery to defined milestones, with fast-track project coordination when a move-in date calls for speed.
Do you handle office fit-out approvals in Dubai and Abu Dhabi?
Yes. KOJ Interiors prepares submission drawings, coordinates documentation with building management and the relevant authorities, and manages compliance and approval follow-up for office fit-outs in Dubai and Abu Dhabi. Approvals stay aligned with the design and construction programme, so your project moves to site with confidence.
Can you refurbish our office while the business stays open?
Yes. KOJ Interiors uses phased fit-out delivery to refurbish offices inside working buildings. We sequence each area around daily operations, keep occupied zones safe and clean, and hand over completed areas in stages, so your teams, visitors and clients keep working comfortably throughout the refurbishment.
What is the difference between Cat A and Cat B fit-out?
Cat A is the landlord’s base-build finish: ceilings, raised floors, core MEP distribution and fire systems, ready for an occupier. Cat B is the occupier’s interior fit-out: partitions, meeting rooms, reception, joinery, lighting, finishes and branding. KOJ Interiors confirms the right scope with you during the brief.
Do you deliver office fit-out in Abu Dhabi?
Yes. KOJ Interiors has an office in Abu Dhabi, and our work in the capital includes a financial headquarters fit-out, an auditorium and corporate interior of approximately 3,000 sqm, and The Airport Lounge refurbishment at Abu Dhabi International Airport, all delivered by the same accountable team.
What is included in an office fit-out?
A KOJ Interiors office fit-out includes space planning and interior design, detailed drawings and joinery documentation, MEP and site coordination, submission drawings and approval follow-up, civil and interior works, ceilings, flooring and wall finishes, custom joinery and lighting, then site supervision, snagging, handover and post-handover assistance.
Do you offer design and build for office fit-out?
Yes. KOJ Interiors offers Design & Build for offices, with one accountable team from space planning and concept design through technical drawings, approvals, fit-out and handover. If your design team has already completed approved drawings, our Build Only model delivers the fit-out execution, site coordination, quality control and handover.

◆

◆

◆

◆

◆

◆

◆

◆

◆

◆